Case Studies: 1 Yr. Pilot Study Gas Wells

Treatment Goals

  • Control SRB population
  • Reduce H2S hits
  • Reduce frequency of mechanical failures

Results

  • At the end of one year, 144 tests performed on the fluid from the production tanks showed only one hit of H2S at (10 ppm)
  • Upon pulling tubing in a test well to inspect for scale and corrosion (244 joints total with 19 jointes layed down), the operator rated the tubing with only a 7% loss

 