Case Studies: 10 Producing Wells

10 Producing Wells in Seward County, Kansas had iron sulfide and scale deposition.

Treatment Goals:

  • Reduce iron sulfide deposition
  • Remediate scale deposition
  • Provide corrosion protection to metallic surfaces
  • Reduce the frequency and expnse of mechanical failures

One Year Lookback (Independent Cost Analysis Performed by Operator)

  • Double-click on the table below to enlarge

One Year Lookback (Independent Cost Analysis)

RESULTS:

  • A significant cost savings was achieved
  • Iron Sulfide, scale, and corrosion related failures were dramatically reduced
  • As a result of the success of this 10-well project, the operator has added 33 more wells to the treatment program in this area

 